I'v had 3 quotes for a replacement boiler and replacing pipework on one-pipe system conventional vented by a 2 pipe system.. The old rads (1965) seem OK & will stay).
I've been quoted on a W Bosch 18Ri by B Gas, another on a 24i System and now the 3rd plumber says system boiler is too risky on old rads and he can see I need a W Bosch 30CD (just by 'experience').
I calculate the requirement as no more than 16 at tops. What is the likely problem if I have the 30CD...will it be inefficient.
The other 2 are W Bosch approved installers, and appear to know what they are talking about.
I've been quoted on a W Bosch 18Ri by B Gas, another on a 24i System and now the 3rd plumber says system boiler is too risky on old rads and he can see I need a W Bosch 30CD (just by 'experience').
I calculate the requirement as no more than 16 at tops. What is the likely problem if I have the 30CD...will it be inefficient.
The other 2 are W Bosch approved installers, and appear to know what they are talking about.