Hi there, I have been a reader for a while but have never posted.
I'm in the middle of buying a top floor Victorian 1 bed flat in London. It is an utter cesspit. To enable me to get out of my miserable dead-end job and reduce my enormous mortgage I need to develop it. I have the small and horrible experience of falling out with about 5 Polish builders over a bathroom in my current flat and now face project managing something much bigger becuase I can't afford to pay a decent builder to do the whole thing.
Basically my builder who I cannot afford (quoted 20k before materials!)says it needs a total rewire - should I bargain the asking price down?
There is a horrid little bathroom at the front of the house separated vertically by a false wall from the boxy little living room. I want to take down the wall, put the kitchen where the bathroom is and create an open-plan kitchen/living room thus having two windows instead of one.
The kitchen is down a few stairs at the back of the flat and depressing. I want to make this the bathroom as it is so far from the living room.
Additionally I have to take down woodchip wallpaper throughout!
There is also a loft which I may buy and develop later on.
1) What do I do first please once I exchange? Contact building regs and the freeholder who is the council?
2) Will I need the rewire before the swapping of kitchen and bathroom or should the plumbing be done first?
3) Should I bargain for the cost of the re-wire before I exchange?
Thanks in advance for any help and please excuse the long first post!
I'm in the middle of buying a top floor Victorian 1 bed flat in London. It is an utter cesspit. To enable me to get out of my miserable dead-end job and reduce my enormous mortgage I need to develop it. I have the small and horrible experience of falling out with about 5 Polish builders over a bathroom in my current flat and now face project managing something much bigger becuase I can't afford to pay a decent builder to do the whole thing.
Basically my builder who I cannot afford (quoted 20k before materials!)says it needs a total rewire - should I bargain the asking price down?
There is a horrid little bathroom at the front of the house separated vertically by a false wall from the boxy little living room. I want to take down the wall, put the kitchen where the bathroom is and create an open-plan kitchen/living room thus having two windows instead of one.
The kitchen is down a few stairs at the back of the flat and depressing. I want to make this the bathroom as it is so far from the living room.
Additionally I have to take down woodchip wallpaper throughout!
There is also a loft which I may buy and develop later on.
1) What do I do first please once I exchange? Contact building regs and the freeholder who is the council?
2) Will I need the rewire before the swapping of kitchen and bathroom or should the plumbing be done first?
3) Should I bargain for the cost of the re-wire before I exchange?
Thanks in advance for any help and please excuse the long first post!