Hey,
Can someone confirm the socket/switches/control height regs in Part M.
When does it actually apply? I.e.
Existing detached garage, built before Part M, change of use to say a cinema room
New extension to a house built before Part M
Loft/attached garage conversion to a house built before Part M
Do any/all of these fall within the 450mm-1200mm requirement? Even if the rest of the house doesn't?
Thanks
Can someone confirm the socket/switches/control height regs in Part M.
When does it actually apply? I.e.
Existing detached garage, built before Part M, change of use to say a cinema room
New extension to a house built before Part M
Loft/attached garage conversion to a house built before Part M
Do any/all of these fall within the 450mm-1200mm requirement? Even if the rest of the house doesn't?
Thanks