To drain the CH/HW system I get the ideas (stop water, open drain valve, open upstairs bleed valve etc...). If I wanted to drain it partially e.g. to about a foot above the pump (I have a hole in a section of pipe about 2 feet above the pump, so plan to replace that piece of pipe), does anyone have any tips for 'knowing' when the system is sufficiently drained? Thanks.