Hi,
We are getting a new kitchen fitted next week and it will be a couple of weeks later before the lad doing the kitchen can return to do the laminate flooring.
Therefore
Can I laminate the area where the washing machine is going to be, plumb the w/m in and then when the joiner comes back he can use this laminate as a starting point?
This means I wont have to pull the w/m out and replumb it all back in when the laminate goes down.
The reason I ask is because the position of the w/m is such that I have to use a long water connection hose and double the length of drainage pipe to reach the drain / water connection, hence a royal pain in the ass to get in out.
We are getting a new kitchen fitted next week and it will be a couple of weeks later before the lad doing the kitchen can return to do the laminate flooring.
Therefore
Can I laminate the area where the washing machine is going to be, plumb the w/m in and then when the joiner comes back he can use this laminate as a starting point?
This means I wont have to pull the w/m out and replumb it all back in when the laminate goes down.
The reason I ask is because the position of the w/m is such that I have to use a long water connection hose and double the length of drainage pipe to reach the drain / water connection, hence a royal pain in the ass to get in out.