I layed a patio last summer, all looked ok until the frost got in to it.
The pointing as all cracked and is lifting out.
I used a 3 building sand to 1 cement moist mix, as is often recommended on here.
Should I have added anything else, such as frostproofer?
The slabs are fine, I laid them on a 4=1 sharp sand and cement wet mix and they are not moving at all.
Any advice welcome, I know it all needs to come out, but dont want the new stuff to go the same way.
Thanks
Stu