Hi,

I have just built a new 3m x 4m extension and have fitted new trifold patio windows.

I have fitted insulated cavity closures with integrated DPC on the sides.

My question is i have a stepped DPC on the floor so i am left with a gap between the floor insulation and the door frame.

What do i do with it?

I have underfloor heating pipes in the main floor screed, 50mm vertical floor insulation, which means the Concreet screed is approximatley 120mm away from the door frame.

Thanks
 
Sponsored Links
This has been covered often on this forum section.

Basically the screed should run right up to the door sill.

If you have not built the openings into the inner leaf masonry (below dpc) then you need to remove the top course of bricks, fill the trough with dpm or a piece of broad dpc then fill the trough with screed, finishing it up against the patio door sill.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top