Is there anyone who knows a bit about 'Permitted Development' who could help me?
I've bought a house and wish to put in a Dormer to create an additional bedroom.
Looking back at the history of the house - an extension to the rear of the property was built with planning permission back in 1972. This was actually a conservatory type extention. I have since knocked this down and rebuilt with a Flat Roof but still keeping the original footprint and volume of area. This has been signed of by the Building Inspector.
Back in 1996 Planning Permission was granted to rebuild a workshop which was attached to the house and make it into part of the main house (study & utility area). This has been completed.
I've been told that you can add ( subject to conditions ) 70sqm to a building without PP?
Do I have to take into account the extension that was granted permission back in 1972 or can the 70 sqm be in addition to any PP that has previously been given?
I have since found out that a 'loft conversion' was refused PP back in 1996 due to 'over development' concerns. I note also that PP was refused for a Dormer on the same basis back in 1996.
I note that my neighbours have since built a Dormer to their property just like the one I want. This was granted back in 2001.
So- will I still need PP for this Dormer or can I build it under this 70sqm rule? I know rules and regs change but i'm not up to date currently!
Any help much appreciated.
B
I've bought a house and wish to put in a Dormer to create an additional bedroom.
Looking back at the history of the house - an extension to the rear of the property was built with planning permission back in 1972. This was actually a conservatory type extention. I have since knocked this down and rebuilt with a Flat Roof but still keeping the original footprint and volume of area. This has been signed of by the Building Inspector.
Back in 1996 Planning Permission was granted to rebuild a workshop which was attached to the house and make it into part of the main house (study & utility area). This has been completed.
I've been told that you can add ( subject to conditions ) 70sqm to a building without PP?
Do I have to take into account the extension that was granted permission back in 1972 or can the 70 sqm be in addition to any PP that has previously been given?
I have since found out that a 'loft conversion' was refused PP back in 1996 due to 'over development' concerns. I note also that PP was refused for a Dormer on the same basis back in 1996.
I note that my neighbours have since built a Dormer to their property just like the one I want. This was granted back in 2001.
So- will I still need PP for this Dormer or can I build it under this 70sqm rule? I know rules and regs change but i'm not up to date currently!
Any help much appreciated.
B