Hi - Im Installing a new boiler upstairs in my house, and to connect the CH Flow and return I am going to have to take the pipes on a route where they will rise 4" then fall 4" under the floorboards. this is on the main flow and return lines (before any radiators feed off) - Is it ok to do this or will this cause an air block - I havent got much room to add a bleed valve - and anyway It would be under the floorboards!