Hoping not to need a pump as I have a 3.8m head.
I need to run a cold gravity feed, and a more direct hot feed to my new mixer shower I will purchase.
I've not chosen the valve yet but keen to get the pipes laid.
I will have to run a new cold feed from the header tank.
The hot I will tap into the existing 22mm that feeds the rest of the house. I will tap this before another draw on the water, so right next to the tank.
Is it worth running both 22mm/both 15mm or hot 22mm and cold 15mm?
Thanks very much