I'm running 25mm MDPE upto the stop cock. I'm then planning to go to 22mm copper and split in three ways - 15mm plastic to kitchen sink, another 15mm split to combi then 22mm to feed two bathrooms and to split into 15mm at each.
Does this sound sensible?
Does this sound sensible?