Hi
Just a quick question , im in the porcess of re piping the supply in our utilty room . i would like to know is , is there anything i need to do to the plastic 15mm pipe that im going to run between the plaster bord and the brick work.
do i need to run it in trunking or can i just clip it to the brick wall then plaster over it ?
thanks
Just a quick question , im in the porcess of re piping the supply in our utilty room . i would like to know is , is there anything i need to do to the plastic 15mm pipe that im going to run between the plaster bord and the brick work.
do i need to run it in trunking or can i just clip it to the brick wall then plaster over it ?
thanks