pipe work for central heating system

Joined
10 May 2007
Messages
5
Reaction score
0
Location
Hertfordshire
Country
United Kingdom
Hi There,

i am looking to fit a combi boiler and am stuck on running the pipe work?
basically whats the best way to do this? as to me ripping up the entire upstaris floor to cut slots in the rafters would be easiest but there must be a less disruptive way?

Any ideas/suggestions welcome?

Cheers
 
Sponsored Links
ripping up the entire upstaris floor to cut slots in the rafters would be easiest but there must be a less disruptive way?

:eek: Could surface mount pipework :eek:

No seriously, take the boards up ;)
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top