Plaster curing times

Joined
10 Feb 2006
Messages
10
Reaction score
0
Location
Nottinghamshire
Country
United Kingdom
Hi Folks

I have dubbed out a brick wall (quite poorly built, as it is an old victorian terrace) in preparation for two-coat plastering, trying to maintain a key depth of 10mm. I have used mastercrete 1:6 for this.

How long should I leave it before applying the plaster undercoat?

I think I need to start applying the topcoat just as the undercoat has set.
After I have applied the topcoat, how long do I need to leave the wall before I can paint it?

Should I apply any other materials such PVC:water coats at any stage?
Should I wet the wall thoroughly before applying the plaster, or could this damage the suction/structure?

Many thanks
 
Sponsored Links
i'm not sure on the terminology of all your questions, but wetting the surface prior to rendercoat is ideal.

the more water the merrier. :)
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top