ok, just studded and battened all walls. new suspended floor with 22mm p5 (was gonna be glued wood floor but now decided tile. plan is to overlay with 6mm hardi on the floor but not sure what to do on walls.
1. green plasterboard
2. 12mm hardi
wanna tile shower area to ceiling and about 600mm above bath.
with the other plastered areas should i plaster first then tile or tile then plaster to the tile.
opinions..
1. green plasterboard
2. 12mm hardi
wanna tile shower area to ceiling and about 600mm above bath.
with the other plastered areas should i plaster first then tile or tile then plaster to the tile.
opinions..