plastering and tape joins

Joined
4 Aug 2008
Messages
208
Reaction score
3
Location
London
Country
United Kingdom
ive put my ceilings up, and now i got the plasterer in skimming away. i noticed that where the plasterboards join onto one another, on some of them there are some major gaps, and hes just put scrim tape over them. hes not filled in the gaps, should he be filling in the gaps with bonding or something and then putting scrim tape over the joins??? whats the consequences of not filling in the gaps and just scrim taping??
 
Sponsored Links
Most plasterers would fill up any sizeable gaps first before they put the tapes on, that way, the gaps are full up right through the thickness of the boards. By not filling up any large gaps first, the plaster will slump out of the gaps and form a ridge along the joint, plus you can't fill a big gap properly once the fibre tape is on.

Roughcaster.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top