I am going to tile the wall around my bath prior to having a shower fitted over the bath. Some of the plaster had blown which I have taken off and re-done. How long do I need to leave it to dry before I can tile over it?
I have read in some places that you need to leave it for up to 3 months - do I need to leave it that long - I really want the shower fitted before Xmas !!
Thanks
I have read in some places that you need to leave it for up to 3 months - do I need to leave it that long - I really want the shower fitted before Xmas !!
Thanks