Having taken the old sand/lime plaster off the lower half of our toilet because it was originally tiled how can I get the walls plumb to align with the existing plaster above? Can I use an edging strip set in Hardwall/Bonding and tapped done to get plumb all the way round. Not too worried about the finish as we will re-tile.
BTW; there is a not enough depth to fit plasterboard and the walls are not very straight either.
BTW; there is a not enough depth to fit plasterboard and the walls are not very straight either.