I have fiixed 60mmm insulated p/b to walls but due to the sloping ceiling there is a 75mm gap(should have cut angle on top of p/b ).I have filled the gap with expanding foam and then raked it back an inch from p/b level.Do I now fill this with bonding plaster or is something else a better job?(I intend to scrim + skim over).