TIMBER FRAME WALLS - CHANGING DOUBLE SOCKETS FROM PLASTIC TO METAL - TAKEN OUT 25mm METAL SOCKETS AND REMOVED BATTONS AND REPLACED WITH 35mm PLASTIC PLASTERBOARD BACK BOXES, SOCKETS ARE DEAD FLAT SO 25mm WERE TOO SHALLOW - IS THIS SET UP OK FOR TIMBER FAMED, IS IT OK THAT THE INSULATION IS TOUCHING THE BOXES, I HAVE NOT CONNECTED THE EXTRA EARTH FROM METAL SOCKETS TO PLASTIC BOXES AS I HAVE DONE TO METAL BACK BOXES IN THE PAST - IS THIS OK
THANKS FOR ANY ADVICE
THANKS FOR ANY ADVICE