- Joined
- 22 Sep 2024
- Messages
- 7
- Reaction score
- 0
- Country
So I'm getting a concrete base put down of 4x3m which will have the standard MOT base ect and will be level.
My plan is then a few months later for me to lay some porcelain garden slabs on top with a light screed like I was tiling a wall. Reason being a lot of the prep and labour will have already been done.
Is this a bad idea and anything I should look out for?
My plan is then a few months later for me to lay some porcelain garden slabs on top with a light screed like I was tiling a wall. Reason being a lot of the prep and labour will have already been done.
Is this a bad idea and anything I should look out for?