I'm replacing a porch floor as it had sunk and cracked after 40 years (2" cement on clay). I have dug out about 12" below the floor level, put put in 6" hardcore.
Will it be ok to put in 6" of screed (1:4) or would be be better to put in a 4" slab and then 2" screed. There was no dpc and no damp. I will tile floor.
Thanks
Will it be ok to put in 6" of screed (1:4) or would be be better to put in a 4" slab and then 2" screed. There was no dpc and no damp. I will tile floor.
Thanks