Hi,
I am in the final stages of creating a sloping driveway. All of the preparation has been done and I just have the ready-mix to book. When I come to poring the concrete should I start at the top of the slope and work down or start at the bottom and work up?
Once the concrete has been put down and levelled do I need to seal it?
Thanks in advance
Aled
I am in the final stages of creating a sloping driveway. All of the preparation has been done and I just have the ready-mix to book. When I come to poring the concrete should I start at the top of the slope and work down or start at the bottom and work up?
Once the concrete has been put down and levelled do I need to seal it?
Thanks in advance
Aled