Postcrete vs concrete

Joined
29 Oct 2007
Messages
347
Reaction score
7
Location
Coventry
Country
United Kingdom
I have 16 5 foot concrete posts to install, 2ft will be going in the ground

On a budget, looking for advice as to whether to go for postcrete or go for a ballast/cement mix?

What volumes would be required for a ballast/cement mix?

What mix ratio for ballast/cement mix?

For postcrete would it be 2 bags per post?

What would be the difference in cost?
 
Sponsored Links
One part cement, three sand, three stone.

Two bags per post if you use a normal spade. One bag per post if you use a trenching spade.

Postcrete uses rapid setting cement so consider that as an option.
 
Last edited:
One part cement, three sand, three ballast.

Two bags per post if you use a normal spade. One bag per post if you use a trenching spade.

Postcrete uses rapid setting cement so consider that as an option.

The ballast consists of sharp sand doesn't it? So i wouldn't need to add 3 parts sand would I?

Would a jumbo bag of ballast be sufficient for 16 posts?

How many bags of cement would I require?
 
Yeah sorry I meant stone. Post corrected. So 1 cement to 6 ballast.

5 bags cement to a bulk bag of ballast.

Say 30 bags Postcrete at £4 is £120. A bulk bag and 5 cement £90.

Personally I couldn't be arsed mixing all that by hand to save £30. Maybe different if you have a mixer and value cash over time.
 
Sponsored Links
Yeah sorry I meant stone. Post corrected. So 1 cement to 6 ballast.

5 bags cement to a bulk bag of ballast.

Say 30 bags Postcrete at £4 is £120. A bulk bag and 5 cement £90.

Personally I couldn't be arsed mixing all that by hand to save £30. Maybe different if you have a mixer and value cash over time.

Thanks, given the time and effort and the difference in cost I'll go with postcrete

Is it worth adding ballast to the postcrete for added strength?
 
R04cf27c646a90eef5fe6d193cf09e789
 
Yeah sorry I meant stone. Post corrected. So 1 cement to 6 ballast.

5 bags cement to a bulk bag of ballast.

Say 30 bags Postcrete at £4 is £120. A bulk bag and 5 cement £90.

Personally I couldn't be arsed mixing all that by hand to save £30. Maybe different if you have a mixer and value cash over time.

I would've said a bulk bag of ballast is about £45 and 5 bags of dust £25 = £70

Postcrete £4.85 x 30 £145

All wickes prices.

If the soil is good and easy to dig neat holes I'd go postcrete, if it's stoney ground or needs existing posts digging out I would use a bulk bag as you get more material
 
I've just done 8 x 2.9m concrete posts down the side of my house with 300 and 150 gravel boards. (those 300 concrete gravel boards are heavy - and I mean HEAVY) It took a lot of digging out and removal of a wall which formed a 2ft high border. A lot of work which filled an 8yd skip. We used post mix (Cemex) and from that I would not even bother with anything else. Ballast might be a tad cheaper but the post mix is so easy and goes off so quickly it makes the job a doddle.

The other factor is I used a hole borer which meant the space around the posts is very narrow. The post mix flows really easily and fills the hole fully. I don't think ballast mix would have been would have been so easy? I got 3 posts out of 2 bags - about 600 deep. The bags were £4.24, so about three quid a post.
 
My brother in law buys everything from Amazon, he's fallen into some kind of collective hypnosis that everything is cheaper on there. If he wanted postcrete it wouldn't surprise me......
 
Postcrete £22.99 x 30 £689.70
I paid £21 for the 2.9m posts. I've also got another 12 to go but they are 2.4m and cost £18.
The first 5 panels I got were overlap panels at £27.00 - complete rubbish. Sent them back and changed them for close board panels at £47.00.
 
One part cement, three sand, three stone.

Two bags per post if you use a normal spade. One bag per post if you use a trenching spade.

Postcrete uses rapid setting cement so consider that as an option.

Bit weak. OK for wood posts and you expect to be recovering / replacing them in the future.

Better mix is 1 cement, 2 sharp sand, 3 stone (20mm). After 40 odd years of mixing a couple of times a year I always use a measure nowadays to ensure consistency in the mix.
Make the mix dryer than wetter - listen for a 'Flumph' sound in the mixer or when dropping off you shovel; that is as wet as the mix needs to be. (When I worked in a concrete 'factory' the water quantity was also measured - but I was never told that bit.)

If you 'Postcrete' do not add any extra sand or stone to the mix it will weaken it.

If you are using 25Kg sacks of ballast and similar of cement it is roughly 8 bags ballast to 1 bag cement by volume gives a 5:1 mix.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top