Hi all,
I've just decorated, and in doing so I temporarily isolated and removed two radiators. The boiler guage before removal was a bit low(?) at about 0.5 bar. On refit and bleeding the radiators (boiler off) I recharged the system via the TFL to 1.0 bar.
Heating up all fine, and pressure guage reads 1.5 bar after about 10 mins on heating. Because I can't find my user manual I'm rather guessing at a correct pressure to charge to.
Can anyone reassure me I'm close??
Ta if you can,
Mike
I've just decorated, and in doing so I temporarily isolated and removed two radiators. The boiler guage before removal was a bit low(?) at about 0.5 bar. On refit and bleeding the radiators (boiler off) I recharged the system via the TFL to 1.0 bar.
Heating up all fine, and pressure guage reads 1.5 bar after about 10 mins on heating. Because I can't find my user manual I'm rather guessing at a correct pressure to charge to.
Can anyone reassure me I'm close??
Ta if you can,
Mike