Potterton Suprima HE

Joined
1 Mar 2006
Messages
4
Reaction score
0
Location
London
Country
United Kingdom
Have read on here lots of comments on the poor reliability of the Suprima L due to PCB failures etc. The design of this boiler puts all the electrics right next to the heat exchanger which may not have helped matters. The current Suprima HE looks to be a better design with the electricals moved to the bottom of the rack like the old Netaheat. Is the HE a better more reliable boiler than the L or should I steer clear ? Whats a good reliable alternative that will produce around 23Kw.
Thanks for your comments.
 
Sponsored Links
many would and will disagree but i think there is a fag paper difference between modern boilers in the reliability stakes, the suprima is probably as good as any
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top