Morning all,
Ive been browsing the forum for some time now trying to tie down the details of the necessary spec for a garage base i'm looking to put down on the side of my house for a prefab approx 8ft 3 by 20ft 3.
Side of the house is here:
Ive read conflicting suggestions as to how to do the base for it. The garage will be entirely free standing, placed as close to the brick wall as possible to maintain the walk way between the drive and back garden.
So, how do you guys suggest i do the base?
The garage people say 4" aggregate, 4" of concrete in a uniform pad, but ive got my doubts about this, the garage will be used to look after the cars i run so its likely there will be jacks used frequently ( so a lot of point loading) and the odd use of an engine crane.
My Dad (who's a engineer who insists on over-engineering!) has suggested a strip footing, engineering brick upto finished height, small amount of aggregate and then back fill with concrete.
Is this a bit over the top?
Given the 'blank canvas', how would you guys construct the base?
Also, ive heard conflicting stories regarding the DPM, i think its necessary, but some folk are saying that its best without owing to the damp nature of these garages?
Help!
Ive been browsing the forum for some time now trying to tie down the details of the necessary spec for a garage base i'm looking to put down on the side of my house for a prefab approx 8ft 3 by 20ft 3.
Side of the house is here:
Ive read conflicting suggestions as to how to do the base for it. The garage will be entirely free standing, placed as close to the brick wall as possible to maintain the walk way between the drive and back garden.
So, how do you guys suggest i do the base?
The garage people say 4" aggregate, 4" of concrete in a uniform pad, but ive got my doubts about this, the garage will be used to look after the cars i run so its likely there will be jacks used frequently ( so a lot of point loading) and the odd use of an engine crane.
My Dad (who's a engineer who insists on over-engineering!) has suggested a strip footing, engineering brick upto finished height, small amount of aggregate and then back fill with concrete.
Is this a bit over the top?
Given the 'blank canvas', how would you guys construct the base?
Also, ive heard conflicting stories regarding the DPM, i think its necessary, but some folk are saying that its best without owing to the damp nature of these garages?
Help!