I'm about to re-slate the front of my house with reclaims.
However I am considering an application to put a dorma window in. Obviously I should delay the slating until after the window goes in, but I really can't wait, and haven't the time for the window just now.
Question is, as the dorma will (if it gets done) be fairly low down the roof, and I won't want to strip back a massive area. Is there some way of preparing for the slates at a certain position, roughly inline with the top of the dorma, to be lifted at a later date?
And when it's done, how can I avoid a row of tinkles (I think they're called) to finish the 'patch' around the dorma?
Thanks.
However I am considering an application to put a dorma window in. Obviously I should delay the slating until after the window goes in, but I really can't wait, and haven't the time for the window just now.
Question is, as the dorma will (if it gets done) be fairly low down the roof, and I won't want to strip back a massive area. Is there some way of preparing for the slates at a certain position, roughly inline with the top of the dorma, to be lifted at a later date?
And when it's done, how can I avoid a row of tinkles (I think they're called) to finish the 'patch' around the dorma?
Thanks.