i am getting my 2 double bedroom tunnel linked terraced house with a kitchen and living room to ground floor. referbished including a new 4x4 metre extension.
at the moment the bathroom is joined onto the house at the rear made like a porta cabin.
i will be knocking this down ready for the new extension to be built.
i will be getting complete rewired and new central heating(combi with underfloor heating to ground floor)
the second bedroom is being devided into bedroom and bathroom.
most of the plaster is gone bad and has to be removed.
the roof is getting replaced with redland 49 tiles.
i am supplying the kitchen/bathroom/wc/heating/doors/tiles.
i have been quoted £32,000/ £36,000 and £45,000 i liked the builders who quoted £32,000 all are from the FMB website.
what do you think?.
____________________
moderator
please note forum rules, 9
at the moment the bathroom is joined onto the house at the rear made like a porta cabin.
i will be knocking this down ready for the new extension to be built.
i will be getting complete rewired and new central heating(combi with underfloor heating to ground floor)
the second bedroom is being devided into bedroom and bathroom.
most of the plaster is gone bad and has to be removed.
the roof is getting replaced with redland 49 tiles.
i am supplying the kitchen/bathroom/wc/heating/doors/tiles.
i have been quoted £32,000/ £36,000 and £45,000 i liked the builders who quoted £32,000 all are from the FMB website.
what do you think?.
____________________
moderator
please note forum rules, 9