I viewed a job and noticed that the feed to the boiler was a hopper on the wall which was filled manually, it not having a expansion pipe from the boiler. The system was a fully pumped primatic and not having worked on this before I turned the job down.
Can somebody tell me how this system works and why no expansion pipe fitted as I thought this would be dangerous.
Can somebody tell me how this system works and why no expansion pipe fitted as I thought this would be dangerous.