Hi
I am laying a latex (arditex screed) onto a previously tiled wooden floor. A lot of the old adhesive is still down, thats why I thought it would make sense to level the floor with this stuff first.
Do I need to prime the floor first, if so will Bal Bond be ok??
I then intend to tile using Bal fastflex. It says 3 hrs till grouting is ok. I assume from this that you can walk on it after 3 hrs too?
Thanks
Beatts
p.s is it true that you use 2.6Kg / m2 with fastflex? if so then a 5m2 will need two bags (expensive!)
thanks again
I am laying a latex (arditex screed) onto a previously tiled wooden floor. A lot of the old adhesive is still down, thats why I thought it would make sense to level the floor with this stuff first.
Do I need to prime the floor first, if so will Bal Bond be ok??
I then intend to tile using Bal fastflex. It says 3 hrs till grouting is ok. I assume from this that you can walk on it after 3 hrs too?
Thanks
Beatts
p.s is it true that you use 2.6Kg / m2 with fastflex? if so then a 5m2 will need two bags (expensive!)
thanks again