I am tiling my shower room from floor level to the ceiling. One wall has a small recessed window. My wife wants a 1.5" border strip incorporated in the tiling that will go directly below the bottom of the window ledge. If I work to the existing window ledge level the other wall tiles will finish 3/8" from the ceiling. The only way I can correct this is to build up the window ledge height by 3/8". Can anyone suggest the best way to do this please.
The window ledge is about 24" x 7" and at 3/8" poly filla is out of the question. If I purchased a small bag of ready mixed sand and cement would it adhere to the plaster finish on the window ledge?
Thank you for any advice you can give me.
Greatgrey.
The window ledge is about 24" x 7" and at 3/8" poly filla is out of the question. If I purchased a small bag of ready mixed sand and cement would it adhere to the plaster finish on the window ledge?
Thank you for any advice you can give me.