Can anyone advise on this?
I am renovating a townhouse in London to include a new kitchen, 2 bathrooms, basement extension + moving two stud walls. Total cost likely to be c.120k.
I don't have time to manage the project myself, and have been quoted a PM fee of 15% of the contractor costs + 15% of the price of furniture and fittings. This sounds like c.£20k to the PM to manage the building process and source fittings for a 3 month (?) job. It sounds way over the top, but what sort of rate and on what basis should I be paying?
Many thanks!
I am renovating a townhouse in London to include a new kitchen, 2 bathrooms, basement extension + moving two stud walls. Total cost likely to be c.120k.
I don't have time to manage the project myself, and have been quoted a PM fee of 15% of the contractor costs + 15% of the price of furniture and fittings. This sounds like c.£20k to the PM to manage the building process and source fittings for a 3 month (?) job. It sounds way over the top, but what sort of rate and on what basis should I be paying?
Many thanks!