Hi i have to be set straight on orientation please.I have a contract with British gas and sprung a leek in my combi boiler pipework,the engineer fixed the leek and said i would need to have a prv and a mini expansion vessel fitted to stay on there contract,I need to know if my little picture is correct? and i have 2 pics of the notice British gas gave me and 1 of my prv,do i need anything else i.e. a none return valve