Does a aav have to be fitted at the end of a soil stack run. Or could it be positioned as the 4 inch pipe ruins horizontally, via a boss with a 2 inch pipe coming off this. I won't to do this to keep any boxing in to a minimum.
Depends on what the connections on the foul run are and why you need an AAV rather then a vent.
If it's definitely an AAV then it must be fitted at least 300mm above the highest overspill level of any appliance connected to it i.e. 300mm higher than the lip of a basin etc.
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local