Hi Guys,
Not quite sure how to calculate these quantities and how water affects the volume of dry mix vs wet mix.
I have an area of app 2.7m x 5.5m that I need to place a thin amount of oversite concrete on. Roughly 14.85 square metres and about 50mm thick of concrete. How much aggregate and cement would I need to order for this?
Not quite sure how to calculate these quantities and how water affects the volume of dry mix vs wet mix.
I have an area of app 2.7m x 5.5m that I need to place a thin amount of oversite concrete on. Roughly 14.85 square metres and about 50mm thick of concrete. How much aggregate and cement would I need to order for this?