I laid self-levelling-compound over quarry tiles last year (1927 house), everything looked good and sound so proceded to cover that with hardboard and vinyl flooring.
After 6 months the SLC started to lift. I've now taken it all up - very easily.
Two possible problems, either no DPM or I should have PVA'd the quarry tiles first. I suspect that if the lack of a DPM is the problem then PVA (being water soluble) would not have helped.
I have had suggested to me a bitumen coating (several coats) onto the tiles.
I have also seen suggestions that I should "blind" the top coating to give the SLC a better adhesion.
All help welcomed, and referals to specific materials would be great.
After 6 months the SLC started to lift. I've now taken it all up - very easily.
Two possible problems, either no DPM or I should have PVA'd the quarry tiles first. I suspect that if the lack of a DPM is the problem then PVA (being water soluble) would not have helped.
I have had suggested to me a bitumen coating (several coats) onto the tiles.
I have also seen suggestions that I should "blind" the top coating to give the SLC a better adhesion.
All help welcomed, and referals to specific materials would be great.