In the process of digging foundations for a 4x4 log cabin. I've dug an area 100mm larger than the cabin all round. With the slope of the land, one side of the hardcore is going to be around 80mm higher than ground level. For the purpose of putting the type 1 down I've put a length of 3x2 down to effectively box the type 1 in and give me a level to work to. Should I just leave the 3x2 in and fill behind the timber with soil or remove the timber and fill with soil? Thanks.
 
Sponsored Links
What are you trying to do?
Is this a strip foundation or a concrete slab.
 
Sponsored Links
It's a concrete slab. Think I will just put some 8" concrete edging in and back fill with soil.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top