We've had a conventional system with tanks in the loft converted to pressurized system with a valliant combi boiler.
When this was put in we got the guy to put a rad in the loft room. This rad is the highest in the house and is at the end of the pipe work run.
It needs bleeding about once a week. Only a little bit but is this usual? The pressure in the boiler doesn't seem to drop that much. Maybe needs topping up once a month.
If this is normal is there some sort of automatic bleeding valve I could fit to this rad?