Just re-felted my shed with torch-on Texsa.
The shed is 10ft x 8ft apex roof.
Just curious as to how long it should take. I thought I'd have it done in a few hours, but these things often take a lot longer than expected!
Effectively there's four 3m lengths folded around edges/corners.
If I'd done this on a price, I'd be a bit disappointed.
The shed is 10ft x 8ft apex roof.
Just curious as to how long it should take. I thought I'd have it done in a few hours, but these things often take a lot longer than expected!
Effectively there's four 3m lengths folded around edges/corners.
If I'd done this on a price, I'd be a bit disappointed.