I need to chip off old render to my gable end, chimney stack and rear extension and rear gable end with small chimney stack.
I plan to get three quotes broken down into labour costs,raw materials and scaffold hire costs from builders.Also two separate quotes for scaffold hire as I may do some other work myself i.e. painting,gutter repairs re-locating sky dish and need the scaffold longer than the builders would need it plus it may be cheaper.
Can anyone advise me whether a) This is a good way to go about the work I need done? b) when walls rendered do I have to wait several weeks before I can paint on top.?
Any tips/advise much appreciated.
I plan to get three quotes broken down into labour costs,raw materials and scaffold hire costs from builders.Also two separate quotes for scaffold hire as I may do some other work myself i.e. painting,gutter repairs re-locating sky dish and need the scaffold longer than the builders would need it plus it may be cheaper.
Can anyone advise me whether a) This is a good way to go about the work I need done? b) when walls rendered do I have to wait several weeks before I can paint on top.?
Any tips/advise much appreciated.