Building is an L shape, one single pitch on one leg and two pitches on the other L with a small hip section. 2/3rds is accommodation and the rest is two outbuildings.
Felt is coming down in four to five places, I have repaired four other areas with breathable felt. No leaks.
The roof was built in 1981-2.
How long do I wait before refelting.
The tiles are clay Double Roman.
I am contemplating doing the work myself as it is single storey and a large area so expensive. I should be able to re use the tiles, but may require 100 or so replacements.
Felt is coming down in four to five places, I have repaired four other areas with breathable felt. No leaks.
The roof was built in 1981-2.
How long do I wait before refelting.
The tiles are clay Double Roman.
I am contemplating doing the work myself as it is single storey and a large area so expensive. I should be able to re use the tiles, but may require 100 or so replacements.