Hi all,
I am putting a new extension on to the back of my semi and re-routing the bathroom (which was attached to the back) to the centre of the house, meaning the whole back part of the house is now a kitchen.
I have at present a rather complicated rain, wastewater and sewage system with 3 inspection chambers, what I want to do is simplify this and have one single soil pipe leading 8ft to the outside of the house, and have one single waste water pipe from the kitchen.
Can some of the more knowledgeable of you have a look at my before and after diagram and let me know if I have come up with a good and viable solution?
Thanks for your help!
I am putting a new extension on to the back of my semi and re-routing the bathroom (which was attached to the back) to the centre of the house, meaning the whole back part of the house is now a kitchen.
I have at present a rather complicated rain, wastewater and sewage system with 3 inspection chambers, what I want to do is simplify this and have one single soil pipe leading 8ft to the outside of the house, and have one single waste water pipe from the kitchen.
Can some of the more knowledgeable of you have a look at my before and after diagram and let me know if I have come up with a good and viable solution?
Thanks for your help!