I'm building a 'gazebo' with two 440mm brick columns at the front and the same at the back but they'll be tied with a single skin wall between them and then a fireplace in the middle of the wall.
I had planned to fill the columns with concrete and put a couple of L-shaped rebar lengths in the foundation pad to tie the poured concrete to the pad.
My question is, do I need to go all the way to the top of the column (2.1m-ish) with the rebar or can I used cut down lengths, say 150mm bent section with a 500mm (or whatever) vertical section?