Hi Guys
I wanted to ask what is the best way to bed/re reb verges/tiles.
What is required - im getting quotes from 150 for all corners to 600 for all corners. What should the builder or roofer do so that it lasts another 50 odd years. I have double roman tiles and teh house is 70s build. i can see some cracks on the mortar/concrete filled verges and small gaps but its not too bad.
How does water rott battens ?
thanks
I wanted to ask what is the best way to bed/re reb verges/tiles.
What is required - im getting quotes from 150 for all corners to 600 for all corners. What should the builder or roofer do so that it lasts another 50 odd years. I have double roman tiles and teh house is 70s build. i can see some cracks on the mortar/concrete filled verges and small gaps but its not too bad.
How does water rott battens ?
thanks