I bought 45m2 of the above which is in really good condition. it's t&g 150mm wide 25mm thick 2strip beech board that I'm acclimating to my house atm. I'm almost done removing the old secret nails (such fun). anyway
I'm going down in the hallway and kitchen/diner. Hallway and half of the kitchen diner are the old house and level...half of the old half of the k/d is concrete, the other is wood then the extended half is concrete (down 11 months).
still following? clear as mud i know.. anyway the extensions concrete is higher at the join to the old, 2mm one side to 15mm the other (rising over the 5.5m width)
I can't take the whole floor up to the new hight with ply as I'm restricted with openings etc. Can I get away with having a fall over couple of metres?(using compound) and should I nail to the wood, glue to the concrete? or float with underlay + dpm for the concrete.
and all this before I start laying the bloody floor lol seemed such a good idea at the time.
any comments much appreciated... helpful ones even more so
I'm going down in the hallway and kitchen/diner. Hallway and half of the kitchen diner are the old house and level...half of the old half of the k/d is concrete, the other is wood then the extended half is concrete (down 11 months).
still following? clear as mud i know.. anyway the extensions concrete is higher at the join to the old, 2mm one side to 15mm the other (rising over the 5.5m width)
I can't take the whole floor up to the new hight with ply as I'm restricted with openings etc. Can I get away with having a fall over couple of metres?(using compound) and should I nail to the wood, glue to the concrete? or float with underlay + dpm for the concrete.
and all this before I start laying the bloody floor lol seemed such a good idea at the time.
any comments much appreciated... helpful ones even more so