Hello
According to BS7671:2018, which one of the following tests does NOT need to be carried out in a specific order, in relation to other tests, during an initial verification?
A. Insulation Resistance
B. Continuity of conductors
C. Protection by SELV
D. Earth fault loop impedance.
According to BS7671:2018, which one of the following tests does NOT need to be carried out in a specific order, in relation to other tests, during an initial verification?
A. Insulation Resistance
B. Continuity of conductors
C. Protection by SELV
D. Earth fault loop impedance.