I am replacing an 18 year old kitchen in a 1978 house. Some of the old wall units were hung on plasterboard with 10mm backing board fitted between the worktop and the bottom of the wall units. There is no sign of the hanging brackets coming loose.
I plan to reline the stud partition with MR board to take new wall units and a combination boiler (Baxi Duo-Tec 24HE). There will also be electrical sockets above the counter. What stud work, if any, should I add?
Relining will also allow me to conceal new pipes in the partition.
I don't really want to add a layer of plywood behind the entire 12' wall as I'd have to reline the door frame to cater for the extra thickness.
I plan to reline the stud partition with MR board to take new wall units and a combination boiler (Baxi Duo-Tec 24HE). There will also be electrical sockets above the counter. What stud work, if any, should I add?
Relining will also allow me to conceal new pipes in the partition.
I don't really want to add a layer of plywood behind the entire 12' wall as I'd have to reline the door frame to cater for the extra thickness.