Hello There, I'm just in the early stages of this project and I'm trying to work out a few estimates of cost for modifying a (very old) terraced house before the builder starts working on it. After I remove all the old plaster -from every internal wall, is there a rule of thumb for applying sand and cement per square yard. The walls are decent and the brick and old cement (lime based probabably)seem in decent shape. I'm no expert, but I know I'll need to 'tank' the ground floor walls which are dampish near the bottom at some places.
The internal walls for all 3 floors (there is an attic) are all around
55 -60sq. metres.
Even if I was thinking of dry-lining the walls with boards, I think all the walls need sand and cement first (mix 3:1 or 4:1??)