I have a 1882 victorian double bay and the concrete cills have perished / cracked off, i would gues the best to repair would be to remove the leading edge and reform. Any sugesstions on how i connect the new concrete to the existing, i.e do i drill pins / rebar or will the existing concrete cill have enough key.